Breakwater Repair Work in Northeast Side of Untung Jawa Island Completed

Friday, July 2nd 2021 Reporter: Suparni Translator: Maria Inggita 1192

Perbaikan Breakwater di Sisi Timur Laut Pulau Untung Jawa Rampung

(Foto: Suparni)

Thousand Islands Water Resources (SDA) Sub-agency completed breakwater repair in the northeast side of Untung Jawa Island, Untung Jawa Island Urban Village, South Thousand Islands Sub-district.

We rearrange 249 tetrapods thus it can withstand the waves well

Thousand Islands SDA Sub-agency Head, Hendri conveyed, in this repair, his side rearranged the disordered tetrapods along more than 600 meters because of wave.

"We rearrange 249 tetrapods thus it can withstand the waves well. This work has been started since last week and completed yesterday," he mentioned, Friday (7/2).

In this breakwater repair work, his side deployed 14 personnel as well as raft and one heavy equipment ship unit.

"After rearranging tetrapods, we hope it can be stronger to hold high waves and prevent abrasion," he conveyed.

Bagikan ke :
BANG JAKI +indeks
POTRET JAKARTA +indeks
VIDEO +indeks

Hitung Mundur 22 Juni 2027

842
Hari
09
Jam
40
Menit
29
Detik