Friday, January 5th 2018 Reporter: Budhi Firmansyah Surapati Translator: Maria Inggita 1784
(Foto: doc)
PD. Pasar Jaya Director, Arief Nasrudin mentioned, currently Jakarta Provincial Government is preparing Detail Engineering Design (DED) of Tanah Abang Market Block G, Central Jakarta.
Later it will be connected from Tanah Abang Station to Block G and from Block G to Block F
According to plan, skybridge will be built in the location to connect Block G with train station and Tanah Abang Market Block F.
"We are still making its DED. It will be connected from Tanah Abang Station to Block G and from Block G to Block F," he stated, Thursday (1/4).
He added, DED progress doesn't take a long time to finish but his side still needs to wait for its permit to built it. He considers IMB and Amdal permit process takes more than two months.
"While waiting for construction, we relocate merchants in Block G," he expressed.
Currently, Jakarta Provincial Government is still findin
g temporary place (TPS) for 900 Block G merchants to sell.