Wednesday, August 10th 2016 Reporter: Folmer Translator: Nugroho Adibrata 1753
(Foto: Ilustrasi)
Seribu Islands Regency Administration is about to spend Rp 3.27 billion taken from 2016 APBD to build a waste water processing system (IPAL) on Panggang Island.
IPAL project on Panggang Island will take 120 days ahea
Head of Seribu Islands Water Management Sub-dept, Mustajab disclosed, IPAL project on Panggang Island has been set its winning bidder.
"IPAL project on Panggang Island will take 120 days ahead," he told, Wednesday (8/9).
He disclosed that the project is required to maintain the beach from waste. After IPAL, the whole waste, either black water or green water will be connected to the IPAL
"Thus there will no longer waste polluting the beach in Seribu Islands," he finished.