Senin, 12 Januari 2026 Muhammad Ibnu Aqil 106
As the skies opened up this Monday, the Patra Raya Pump House is all hands on deck, operating at full throttle to keep local flooding at bay.
Officials say all five pumps are currently firing on all cylinders to stem the tide along Patra Raya Street in Kebon Jeruk.
The order to kick the system into gear came after floodwaters hit the 16-inch (40 centimeters) mark.
The five-pump setup at Patra Raya is in high gear, boasting a total capacity of 2,600 liters per second