Friday, October 8th 2021 Reporter: TP Moan Simanjuntak Translator: Maria Inggita 907
(Foto: TP Moan Simanjuntak)
West Jakarta Bina Marga Sub-agency repaired connecting road access on Jalan Raya Sukabumi Selatan RT 07/05, Sukabumi Selatan Urban Village, Kebon Jeruk.
This repair work is estimated to be completed in a day
West Jakarta Bina Marga Sub-agency Repair Coordinator, Rifki stated, repair on connecting road access to SDN Sukabumi Selatan 01 Pagi was conducted to follow up report from urban village. The connecting road collapsed three days ago after being crossed by overloaded truck.
"It collapsed three days ago after being crossed by overloaded truck," he conveyed, Friday (10/8).
According to him, repair must be carried out immediately because there is water channel along 2.5 meters with width 95 centimeters under the connecting road. In this repair, his side intalled iron frame and cast it with cement.
"Repair is conducted by 9 Bina Marga Sub-agency personnel. This repair work is estimated to be completed in a day," he said.