Sunday, May 23rd 2021 Reporter: Suparni Translator: Nugroho Adibrata 1188
(Foto: Suparni)
The Thousand Islands Water Islands (SDA) Sub-agency repairs the embankment on the north side of Untung Jawa Island, Untung Jawa Island Urban Village, South Thousand Islands Sub-district.
It is carried out to strengthen the embankment from the impact of the high waves
Thousand Islands SDA Sub-agency Head, Hendri said the repair included reinstalling 70 massive cubes that were previously damaged by the waves and filling the buis with slit stones totaling 17.28 cubic stones.
"It is carried out to strengthen the embankment from the impact of the high waves," he expressed, Sunday (5/23).
To smoothen it, as many as 20 personnel had been deployed to the location.
"It has been ongoing since May 19 and is targeted to be complete today," he stated.