Friday, February 21st 2020 Reporter: Adriana Megawati Translator: Nugroho Adibrata 1563
(Foto: Adriana Megawati)
Six Senen Sub-district Water Resources Executing Unit officers began to repair drainage and reservoir on Jalan Kembang I, Kwitang, Senen, Central Jakarta, on Thursday (2/20).
We repair drainage's damaged manhole cover up to 112 meters that is by elevating a sheet pile as wide as 80 centimeters with 112 meters length
"We repair drainage's damaged manhole cover up to 112 meters that is by elevating a sheet pile as wide as 80 centimeters with 112 meters length," expressed Kwitang Urban Village Head, Rasimun.
In the field, the officers also clean up reservoirs from waste, mud and the rest of the building debris. Its repair will take place over one to two days ahead.
"This reservoir has a dimension of six meters length and 3.5 meters width with 3.5 meters depth. Currently the reservoir has been used to anticipate the overflowing water of Ciliwung River," he stated
.