Sunday, November 22nd 2020 Reporter: Suparni Translator: Nugroho Adibrata 603
(Foto: Suparni)
The drain construction work on Jalan Bougenville, RT 03/02, Untung Jawa Island Urban Village, North Thousand Islands Sub-district has finally completed.
It's also important to overcome inundation
Thousand Islands Water Resources (SDA) Sub-agency Head Abdul Rouf said, it was done on both sides of the road. Each of them was 24.68 meters long with four manholes and the other side was 68.90 meters long along with 10 manholes.
"It is made using a 6-inch paralon," he expressed, Sunday (11/22).
He explained, its construction was executed on October by sending 10 personnel.
"Wastewater from residents' houses is connected to this drain. So, the environment will be cleaner and tidier. It's also important to overcome inundation," he stated.