January-April, 304 Retaining Walls Repaired in South Jakarta

Wednesday, May 6th 2020 Reporter: Mustaqim Amna Translator: Maria Inggita 2717

Sudin SDA Jaksel Perbaiki 304 Turap Batu Kali Selama Januari-April

(Foto: doc)

In January-April period, South Jakarta Water Resources (SDA) Sub-agency has repaired 304 retaining walls in the region.

Length of the retaining wall that we have repaired vary between 2.5 - 115 meters

South Jakarta SDA Sub-agency Head, Mustajab stated, from that amount, his side has repaired 272 road channels' retaining wall, 25 PHB channels' retaining walls, and 7 rivers' retaining walls.

"Length of the retaining wall that we have repaired vary between 2.5 - 115 meters," he mentioned, Wednesday (5/6).

According to him, most retaining wall repairs were made in Jagakarsa with total 112 areas, while the least in Setiabudi with total 12 areas.

"Retaining wall repairs are mostly done during rainy season because this season has a major impact on the condition of retaining walls," he closed.

Bagikan ke :
BANG JAKI +indeks
POTRET JAKARTA +indeks
VIDEO +indeks

Hitung Mundur 22 Juni 2027

842
Hari
09
Jam
40
Menit
29
Detik