Kawi-Kawi Channel's Retaining Wall in Johar Baru Being Repaired

Thursday, April 2nd 2020 Reporter: Adriana Megawati Translator: Maria Inggita 1341

Saluran PHB Sepanjang 7,5 Meter Diperbaiki Satgas SDA Kecamatan Johar Baru

(Foto: Adriana Megawati)

Johar Baru Water Resources (SDA) Unit, Central Jakarta, deployed 10 personnel to repair Kawi-Kawi connecting (PHB) channel's retaining wall on Jalan Tanah Tinggi 1.

All materials used in this repair work are from Central Jakarta SDA Sub-department

Johar Baru Sub-district SDA Unit Head, Rudi Prasetya stated, retaining wall that needs to be repaired has height of 7.5 meters and width of 3 meters. It was damaged because of being pushed by the roots of protective trees near the location.

"We break down the damaged part first, then build it with new material," he stated, Thursday (4/2).

His side is targeting to finish the repair next week. Besides Kawi-Kawi PHB channel, his side also repaired channel on Jalan Mardani Raya with length 116 meters and width 3 meters.

"All materials used in this repair work are from Central Jakarta SDA Sub-department," he closed.

Bagikan ke :
BANG JAKI +indeks
POTRET JAKARTA +indeks
VIDEO +indeks

Hitung Mundur 22 Juni 2027

842
Hari
09
Jam
40
Menit
29
Detik