Sodetan Construction on Untung Jawa Island Completed

Sunday, March 29th 2020 Reporter: Suparni Translator: Nugroho Adibrata 1055

Pembangunan Sodetan di Pulau Untung Jawa Rampung

(Foto: Suparni)

The a crossing channel or locally known as sodetan construction in SDN 02 area, Untung Jawa Island, Thousand Islands, finally completed, on Saturday (3/28).

Sodetan is connected to the absorption well that is on the main road

"Sodetan is connected to the absorption well that is on the main road," expressed Thousand Islands Water Resources Sub-agency Head, Abdul Rauf, Sunday (3/29).

Untung Jawa Island Urban Village Head Supriyadi said it was made to anticipate flood when it rains.

"Hopefully it can optimally minimize flood during rainy season, as its location is a basin," he stated.

Bagikan ke :
BANG JAKI +indeks
POTRET JAKARTA +indeks
VIDEO +indeks

Hitung Mundur 22 Juni 2027

842
Hari
09
Jam
40
Menit
29
Detik