Buis Concrete Making for Absorption Wells in South Jakarta is Accelerated

Tuesday, February 4th 2020 Reporter: Mustaqim Amna Translator: Nugroho Adibrata 1665

Pembuatan Buis Beton Untuk Sumur Resapan Dipercepat

(Foto: Mustaqim Amna)

The South Jakarta Water Resources Sub-agency is speeding up making buis concrete for absorption well material. The plan is to build 100 wells this year in South Jakarta.

This month, we target to build 800 units

To achieve that target, there must be 6,500 pieces of buis concrete. Its making is processed in Rawa Minyak Building, Jalan AUP, RT06/10, Pasar Minggu Urban Village.

"This month, we target to build 800 units," expressed South Jakarta Water Resources (SDA) Sub-agency Head, Mustajab, Tuesday (2/4).

He explained buis concrete has 80 cm diameter and 100 cm height. Later on, the worker would be divided into three shifts.

"There are 30 workers to make the concrete. Hopefully all can run well thus we can realize well project in each corner of the location," he stated.

As for the information, absorption well is very useful during the rainy season to reduce the risk of inundation, absorb rainwater to enter the ground, as a container before flowing into waterways and to prevent drought disaster.

Bagikan ke :
BANG JAKI +indeks
POTRET JAKARTA +indeks
VIDEO +indeks

Hitung Mundur 22 Juni 2027

842
Hari
09
Jam
40
Menit
29
Detik