Wednesday, December 11th 2019 Reporter: Nurito Translator: Nugroho Adibrata 1384
(Foto: Nurito)
The East Jakarta Water Resources Sub-agency reports normalization project on a water channel as long as 302 meters stood atop Jalan SMAN 71, Duren Sawit has touched 97 percent.
It is done to eradicate flooding when it rains
"It is done to eradicate flooding when it rains," expressed East Jakarta Water Resources Sub-agency Head, Santo, Tuesday (12/10).
This work that has been carried out since early October is carried out by installing a U-Ditch concrete measuring 100x10 cm and 100x120 cm.
"To execute it, we already poured Rp 1 million," he stated.