December, Daan Mogot Reservoir Development Finished

Friday, November 8th 2019 Reporter: Aldi Geri Lumban Tobing Translator: Nugroho Adibrata 968

Pembangunan Waduk Daan Mogot Capai 50 Persen

(Foto: Aldi Geri Lumban Tobing)

The Daan Mogot Reservoir development in Duri Kosambi Urban Village, Cengkareng, West Jakarta has reached 50 percent.

I'm sure it will finish soon

"Yesterday I reviewed the location directly. After the work is done, it will continue with the establishment of the overall reservoir area," expressed Jakarta Water Resources Agency Head Juaini Yusuf, Thursday (11/7).

It will be one of the sources of raw water to meet the needs of clean water for the Pesakih Flat Tower citizens.

"This reservoir will be multifunctional. So, not only to minimize inundation or flooding," he explained.

It can also accommodate water from the effluents from the IPAL in each flat.

"After meeting the quality standards, the waste water flowed into the reservoir will be processed into clean water and then distributed to the flat units," he told.

He added it would also be a green open space (RTH) that is completed with jogging track facilities to a bridge that can be used for selfies.

"Surely they can interact with each other there," he uttered.

He is optimistic that the project developed with the naturalization concept with a budget by Rp 12 billion, will be completed in December.

"Its land is about 1.2 hectares, I'm sure it will finish soon," he stated.

Bagikan ke :
BANG JAKI +indeks
POTRET JAKARTA +indeks
VIDEO +indeks

Hitung Mundur 22 Juni 2027

842
Hari
09
Jam
40
Menit
29
Detik