Mud Dredging in Maja River Has Touched 50 Percent

Reporter : Rudi Hermawan | Editor : Nugroho Adibrata | September 25th, 2019 01:28 PM 13:28 WIB | Dibaca 93 kali
Mud Dredging in Maja River Has Touched 50 Percent (Foto : Rudi Hermawan / Beritajakarta.id)

The mud dredging process in Maja River, Pegadungan, Kalideres, West Jakarta has reached 50 percent. It is carried out from Jalan Peta Utara up to Bambu Larangan and targeted to be complete in October.

" It has been ongoing since August and aims to minimize inundation in Kalideres area"

"It has been ongoing since August and aims to minimize inundation in Kalideres area," expressed West Jakarta Water Resources Sub-agency's Raw, Clean and Waste Flood Waters Control Maintenance Head, Imam Prasetyo, Wednesday (9/25).

It is carried out up to 1,050 meters length with 1-1.5 meters depth.

"To do it, we have deployed amphibian and spider excavators plus 10 dumb trucks and 15 personnel to the location," he closed.

TOP