Monday, May 6th 2019 Reporter: Wuri Setyaningsih Translator: Nugroho Adibrata 1474
(Foto: Wuri Setyaningsih)
A water channel on Jalan HR Rasuna Said is still being normalized after the findings of damaged manhole covers and its debris, which impede the flow of water.
It is targeted to be finished this week
Setiabudi Sub-district Water Resources Executing Unit Head, Agus Bowo Leksono said that the manhole cover is damaged due to the passing vehicle.
"The damage reaches 100 meters length with 1 meter width and 1.2 meters depth," he expressed, Monday (5/6).
To conduct normalization, he side has sent 37 officers to the location.
"It is targeted to be finished this week," he stress
ed.