S. Jakarta SDA Builds New Retaining Walls at Cabang Tengah River

Wednesday, November 7th 2018 Reporter: Wuri Setyaningsih Translator: Maria Inggita 1992

 Turap Kali Cabang Tengah Dibangun

(Foto: Wuri Setyaningsih)

South Jakarta Water Resources (SDA) Sub-dept. builds new retaining walls in Cabang Tengah River, Jl. Kahfi II, Jagakarsa Sub-district, South Jakarta.

New retaining wall has 266 meters long for the right side and 474.6 meters for the left side

South Jakarta SDA Sub-dept. Development Section Head, Didi Sugandhi stated, construction is done because former retaining wall is prone to landslide.

"New retaining wall has 266 meters long for the right side and 474.6 meters for the left side. Its length reaches 2-5 meters," he informed, Wednesday (11/7).

He explained, his side uses third party from e-catalog auction system to build the new retaining walls. This contract mentioned Rp 4,704,452,613 for its value with construction period from October 1 to December 15.

"Until now, retaining wall construction has reached 45 percent," he mentioned.

Bagikan ke :
BANG JAKI +indeks
POTRET JAKARTA +indeks
VIDEO +indeks

Hitung Mundur 22 Juni 2027

842
Hari
09
Jam
40
Menit
29
Detik