Elevation Construction on N. Jakarta Mayor Office's West Plaza Reaches 75 Percent

Reporter : Budhi Firmansyah Surapati | Editor : Maria Inggita | September 18, 2018 03:42 PM | Hits 214
(Foto : Budhi Firmansyah Surapati / Beritajakarta.id)

North Jakarta Mayor Office's West Plaza yard is being elevated. This construction has reached 75 percent and targeted to complete by the end of this September.

" South side of West Plaza area only needs a final touch. Today, we start to repair water channel"

North Jakarta Government's General and Protocol Section Head, Dedi Sumardi said, this four thousand square meters area is elevated around 30 centimeters from the existing surface. Currently it remains south gate access that need to be elevated.

"South side of West Plaza area only needs a final touch. Today, we start to repair water channel," he mentioned, Tuesday (9/18).

After Mayor office's backyard is elevated, he hopes water will not inundate the area again like the previous year. Not only elevating yard and repairing water channel, but his side also adds one water pump in south gate access.

"Our sewer that leads to Jl. Yos Sudarso needs a pump. We already have three pumps and we need one more to strengthen it," he conveyed.